Brief: Discover the high-performance Rack And Pinion Heavy Payload Construction Site Elevator SC250BG KP-B19, designed for efficiency and durability. This construction hoist features modular design, high-strength materials, and advanced VFD technology for smooth operation. Ideal for heavy payloads up to 2,500 KG and lifting heights up to 450 meters.
Related Product Features:
Modular design with standardized and universal components for easy assembly and maintenance.
Constructed from 16Mn and Q355B high-strength cold roll steel plate for durability.
Laser-cut and CNC-processed parts ensure precision and reliability.
Robot-welded cage roof prevents water leakage and enhances strength.
Variable Frequency Drive (VFD) ensures smooth starting/stopping and reduces wear.
Payload capacity of 2,500 KG per cage with a lifting speed of 0-80 m/min.
Maximum lifting height of 250/450 meters, adaptable with step-up/step-down transformer.
Complies with European Regulation EN 12159:2012 and EN 60204-1:2006/A1:2009.
What materials are used in the construction of this elevator?
The main structure is made of 16Mn and Q355B high-strength cold roll steel plate, laser-cut and CNC-processed for precision, with robot-welded components for durability.
Does this elevator comply with international safety standards?
Yes, the SC250BG KP-B19 is TUV proved and complies with European Regulation EN 12159:2012 and EN 60204-1:2006/A1:2009, ensuring high safety standards.
What is the maximum lifting height of this construction hoist?
The maximum lifting height is 250 meters standard, extendable to 450 meters with a step-up/step-down transformer upon request.